The tables below outline the requirements for each scheme. Please contact us if you would like more details.
For further information please head to the specifications page or click here to enquire about joining.
Manufacturing Schemes | ||||
Initial requirements | Ongoing requirements | |||
Factory Audit | Initial type testing | Factory Audit | Periodic product testing | |
General Performance Windows (BS644, BS7412, BS4873, BS6510, BS644, BS8529) | ✓ | BS6375-1 BS6375-2 BS6375-3 | Minimum one factory visit per year | 3 yearly air tightness, water leakage (BS6375-1) |
Enhanced Security Windows (PAS24) | ✓ | PAS24 | Minimum one factory visit per year | PAS24 yearly |
Noise reducing / acoustic performance (BS EN 10140-2) | ✓ | BS EN ISO10140-2 | Minimum one factory visit per year | 3 yearly test to BS EN ISO 10140-2 |
Fire resistant doorsets (BS 476 Pt22 / BS EN 1634) | ✓ | BS 476 pt22 or BS EN 1634 | Minimum one factory visit per year | 3 yearly fire resistance test |
Insulating Glass Units (BS EN 1279) | ✓ | BS EN 1279-2 and 1279-3 | Minimum one factory visit per year | Annual climate, gas loss and UV fogging tests |
Toughened safety glass (BS EN 12150 / BS EN 14179) | ✓ | BS EN 12600 BS EN 1288-3 BS EN 12150-1 | Minimum one factory visit per year | Annual fragmentation test |
Site Activity Schemes | ||||||
Initial requirements | Ongoing requirements | |||||
Head Office Audits | Office procedure audit | Site visit | Head office Audits | Site Visits | ||
Installation of Fire Resistant door sets | ✓ | ✓ | Minimum of two visits per year | |||
Maintenance of Fire Resistant door sets | ✓ | ✓ | Minimum of two visits per year | |||
Inspection of Fire Resistant door sets | ✓ | ✓ | Minimum of two visits per year | |||
Installation of Fire Stopping | ✓ | ✓ | Minimum of two visits per year | |||
Installation of Windows, Doors, Conservatories and Orangeries | One for each location where installations are co-ordinated | Annually | One for each location where installations are co-ordinated | Minimum of two visits per year |